How To Do An Epoxy Floor In Sections


In many cases your floor cannot be epoxied all in one shot due to too much stuff to move out or the floor had some repair areas done for lets say for new plumbing. In the case of where you have an existing floor where you cut out some concrete to repair or to install new plumbing. You now have to wait 28 days for the new concrete over the new plumbing to cure but you need the rest of the floor before then. Here’s how you do the floor in sections so you don’t end up with a seam.

Tape off where you need to end the first section then apply the first layer of coating whether it’s a primer or an epoxy. Then apply the next layer and keep back about 12″ from edge of first layer. If you’re using our Ultra Military System you’ll have a third coat to do. So you would apply that and stay back 12″ from second layer. Now you have a stepped layer effect.

Next lightly sand with 100 grit a 12″ strip of each layer that will be overlapped when you do the next section. The reason for this is that after 24 hours our epoxies start to seal up and then it becomes like trying to paint over glass. So always rough up an epoxy that you’re overlapping after 24 hours. This insures a proper bond from the first section with the subsequent sections.

Now in the case with the new concrete areas we would recommend you start your tape line 12″ back from the new concrete. Everything else is the same as above. Just be sure to acid etch the new concrete after 28 days before applying any of our epoxy flooring systems.

And of course if you have any questions please feel free to contact us at info@armorgarage.com or 866-532-3979.

Facebooktwitterredditpinterestlinkedinmail